New construction, mixed-use building in downtown Ashland, Or...read more »egon.
1st floor: Restaurant and wine tasting
2nd floor: Six hotel units
3rd floor: Six condominium units
« read less
Napa Sanitation District - Aerator Addition Job 1266.00
Planning and design of aeration system for 100 acre treatmen...read more »t pond system. Included integration with plant control system. Electrical loads were separated by 12-KV overhead distribution and 12-KV to 480-volt unit substation sized for this project as well as permanent sludge dredge and conveyance system. « read less
Electrical, lighting, mechanical, and plumbing design for th...read more »e Neighborhood Church of Redding, located in Redding, California. The project consists of one Worship Building with infracstructure and provisions for future buildout. The Worship Building is approximately 25,000 square feet, and includs space for a Sanctuary area as well as several rooms for support activities. « read less
Electrical and lighting design for the Karuk Tribal Wellness...read more » Center located in Yreka, California. The building in an 18,000-square-foot facility which will house a gymnasium large enough for a regulation basketball court, a men's and women's locker room, an exercise room, a commercial kitchen, and office spaces. The building is to promote sustainability through energy efficient, environmentally friendly, and universally accessible design which is cost effective. « read less
Engineering design of electric power to and from new powe...read more »r supplies for a fiber glass manufacturing plant located in Willows, California. Mechanical engineering: determined cooling tower capacity and design of piping to supply two new power supplies and exisiting heat loads. « read less
Programming, configuration, and integration of telemetry ...read more »equipment and control system components for essential elements of the Garberville Sanitary District's water acquisition, treatment, and distribution system in Garberville, California.
Project consists of three sites:
Raw water pumping station (complete rehabilitation)
Water treatment plant (new facility)
Water storage tank and booster pumping station (rehabilitation)
Project elements include:
150 MHz, licensed radio telemetry
PLC control of each site
Operator interface at water treatment plant for for system control
« read less
Dublin San Ramon Services District (DSRSD) SCADA Job 1324.00
Design of a replacement Supervisory and Data Acquisition ...read more »(SCADA) System for the Dublin San Ramon Services District (DSRSD) in Dublin, California. Project elements include inventory of existing system, preparation of SCADA design standards, communications system evaluation and design, preliminary and final engineering design, bid phase assistance, construction engineering services and construction management. « read less
Construction management and observation, and engineering ser...read more »vices during construction for a $4.5 million upgrade to the Dublin San Ramon Service District's (DSRSD) Field Operations Division Supervisory Control and Data Acquisition (SCADA) System covering 47 remote sites. On-site construction management over 80-week project duration, including site inspections, contractor coordination, scheduling, permit coordination, and related construction management services. « read less
Plumbing design for tasting room kitchen, banquet kitchen...read more », and wine bar for the Ariel Wine Barn located outside Ashland, Oregon. « read less
Northern California & Oregon Engineering Company serving Redding, the Bay Area, and the surrounding Northern California area, as well as Medford, Rogue Valley, Willamette Valley, Southern Oregon, Central Oregon, Nevada, Washington, Idaho, Utah, and Arizona.