Design of mechanical, electrical, plumbing (MEP), and lighti...read more »ng for a 14,500-square-foot two-story day-use Alzheimer’s center. « read less
Solano Community College - Building 1400A Job 0640.00
This project consisted of power distribution and lighting de...read more »sign for modernization of a 31,000-square-foot Student Union Building (Building 1400A). The design effort also included the addition of a 2,000-square-foot dining room/command center. This project included the following design items: Coordinate with on-site campus-owned fiber optic systems for telephone/data/fire/intrusion; design of MDF and IDF distribution equipment; fire alarm coordination; complete lighting redesign utilizing energy-efficient fixtures including T5 lamps; lighting control system utilizing Lutron’s ECO-System for campus integration. « read less
Delta Diablo Sanitation District Electrical/I&C Improvements Job 0642.00
Designed electrical, instrumentation and controls, and SC...read more »ADA for treatment plant expansion to provide cooling water to 880-MW power generation plant. Feeds were designed for flexibility and included the following: 480-volt commercial power source, 480-volt source from power plant 21-kV source from power plant, with unit substation at cooling water facility « read less
Designed electrical, instrumentation and controls, and SC...read more »ADA for treatment plant expansion to provide cooling water to 880-MW power generation plant. Feeds were designed for flexibility and included the following: 480-volt commercial power source, 480-volt source from power plant 21-kV source from power plant, with unit substation at cooling water facility « read less
Designed electrical, instrumentation and controls, and SC...read more »ADA for treatment plant expansion to provide cooling water to 880-MW power generation plant. Feeds were designed for flexibility and included the following: 480-volt commercial power source, 480-volt source from power plant 21-kV source from power plant, with unit substation at cooling water facility « read less
Solano Community College - Building 1700A Job 0643.00
Power distribution and lighting design for the modernization...read more » of a 47,000-square-foot gymnasium building. Design included the following:New service entrance. New scoreboard/time clock. New bleacher motors/backstop motors. Design of energy-efficient lighting utilizing T5 lamps. Lutron ECO-System lighting controls. Design of IDF distribution equipment. Coordination of fire alarm design. Design extension of campus-owned 12kV distribution and fiber optic (telephone/data/fire). « read less
Solano Community College - Building 1700B Job 0645.00
Power distribution and lighting design for the construction ...read more »of a new 8,000-square-foot adaptive Physical Education Building. Design included the following: Design extension of campus-owned 12kV distribution and fiber optic (telephone/data/fire).Design of IDF distribution equipment. Fire alarm coordination. Lutron ECO-System for lighting controls. Parking lot/site lighting. « read less
Field investigation and design of electrical and lighting fo...read more »r a 50,000-square-foot historical building. Prepared design documents to implement four hotel suites in an unimproved area for the first floor consisting of 1,800 square feet. In addition, the entire second floor was remodeled to add an elevator, accommodate 12 hotel rooms, laundry room, conference room, and a large assembly room. « read less
Northern California & Oregon Engineering Company serving Redding, the Bay Area, and the surrounding Northern California area, as well as Medford, Rogue Valley, Willamette Valley, Southern Oregon, Central Oregon, Nevada, Washington, Idaho, Utah, and Arizona.