Las Gallinas Valley Sanitation District - Integrated Wastewater Master Plan Job 2040.00
ArcSine was selected by a large, national engineering firm t...read more »o perform a Site Security Assessment of 15 remote collection system sites, with the conclusions and recommendations included in an Integrated Wastewater Master Plan. « read less
ArcSine provided planning and detailed design of the relocat...read more »ion/replacement of the District's Supervisory and Data Acquisition (SCADA) System from the existing location at the District's primary wastewater treatment facility, to the new Operations Control Center. « read less
Planning, design engineering, and construction support to re...read more »place the primary 115kV-12kV substation at the Central Contra Costa Sanitary District's Wastewater Treatment Plan in Martinez, California, with a new 12kV substation to be centrally located in the heart of the plant. Work included integrating 2 cogen and 2 12kV standby generators into the new substation, redistributing power to the subordinate 12kV substations located throughout the plant, and coordinating with PG&E to provide new redundant electrical services. « read less
On-call Engineering Support for the Central Contra Costa Cou...read more »nty Sanitary District, in Martinez, California, to provide electrical/instrumentation and controls/mechanical consultation for various pump station and treatment plan projects as identified by the District on an as-needed basis. « read less
San Clemente State Beach Combo Building #6 Job 2340.00
This project included MEP design for a new comfort station b...read more »uilding located in San Clemente State Beach, California. The 1,125-square-foot comfort station includes and upgraded ADA pathway and parking.
Key Design items include:
Design of a new electric service for the building
Design of domestic water, sanitary drain, and vent systems
Ventilation load analysis « read less
City of Cloverdale - WTP SCADA Improvements Job 2349.00
Design and programming/integration work to modernize the Cit...read more »y of Cloverdale's Water Treatment Plant (WTP) Supervisory and Data Acquisition (SCADA) Sytem. Improvements consisted of replacing aging workstations and servers, replacing the Plant's primary Modicon Quantum PLC with a Schneider M580 PAC, configured with a redundant hot-standby CPU, and migrating the unlicensed Wonderware supervisory software and historian to AVEVA InTouch software and historian. « read less
Iron Mountain Operations (IMO) oversees the operation of the...read more » Iron Mountain Mine, a U.S. Environmental Protrection Agency (EPA) Superfund site located in Redding, California. IMO's primary objective is to control and treat acid mine leachate to protect vital salmoid fisheries in the upper Sacramento River Valley. This project replaced eight remote site programmable logic controllers (PLC's) and the primarty wastewater treatment plant PLC with modern PLC's. ArcSine's role was to design, program, replace, and test/commission the new PLC system, including interacting with the exiting AVEVA supervisory system software (integrated by ArcSine in 2022). « read less
Northern California & Oregon Engineering Company serving Redding, the Bay Area, and the surrounding Northern California area, as well as Medford, Rogue Valley, Willamette Valley, Southern Oregon, Central Oregon, Nevada, Washington, Idaho, Utah, and Arizona.