Power distribution and lighting design for a 2,900 square-fo...read more »ot restaurant tenant improvement project located in Anderson, California. « read less
Crater High School Performing Arts Center Boiler Replacement Job 2220.00
Electrical equipment modifications to accommodate the replac...read more »ement of boiler equipment at the Crater High School Performance Arts Center, field investigation to ascertain existing site conditions, and load calculations.
Equipment to be replaced included boiler, heating water pump, starter for heating water pump, and starter for chilled water pump. « read less
This project included power distribution, lighting, HVAC, an...read more »d plumbing design for a new, three-story, 19,77 square-foot, multi-family apartment building in Arcata, CA. The project included design of a roof-mounted photovoltaic solar system.
« read less
Work included the electrical design for the downtown housing...read more » project located at the Boomtown Center of the City of Shasta Lake, California. The 65,000-square-foot, three-story housing project included two separate buildings, Building A, Building B, and City parking lots.
Key Items included:
- Design of new electric service for each building
- Design of power provisions for future electric vehicle charging stations
- Schematic design for photo-voltaic system for each building and parking lot area
« read less
Engineering services during bidding (SDB) and services durin...read more »g construction (SDC) for improvements to Paradise Irrigation District's primary water treatment plant in Magalia California. The improvements added a new pump station to the Zone A Plant effluent. « read less
On-call Engineering Support for the Central Contra Costa Cou...read more »nty Sanitary District, in Martinez, California, to provide electrical/instrumentation and controls/mechanical consultation for various pump station and treatment plan projects as identified by the District on an as-needed basis. « read less
Phoenix High Schooll Tennis Courts Lighting Job 2331.00
Power distribution modification and lighting design fora new...read more » 26,000 square-foot tennis court complex at the Phoenix High School in Phoenix, Oregon. « read less
Power distribution, lighting, and fire alarm system modifcat...read more »ions to accompdate the removal and replacement of the Dunsmuir High School Gymnasiium roof structure, which sustained damage during heavy snowfall in February 2023. « read less
This project included power distribution and mechanical desi...read more »gn for a new 6,700 square-foot walk-in cooler in the Golden Brands Warehouse located in Redding, California. The project comprised of Title 24 documentation, load justification using the 12 month historical peak load data from the Electric Utility, and a field investigation to document existing conditions. « read less
Southern Oregon University - Central Hall Basement Job 2354.00
The project includes power distribution, lighting, HVAC, and...read more » plumbing design for the basement remodel of Central Hall on the campus of Southern Oregon University in Ashland, Oregon. Also included: improvement design to an existing 14,000 square-foot basement to accomodate one classroom, 29 offices, two bathrooms, and 24 micellaneous rooms for the ROTC, USEM, DR, and UCAM. « read less
Design of six-room, high-technology facility. Included prov...read more »isions for 35 networked computer workstations, video studio, and master control room. Power quality was ensured through segregated power sources and power conditioning equipment. Lighting, fire alarm, and video studio design. « read less
Northern California & Oregon Engineering Company serving Redding, the Bay Area, and the surrounding Northern California area, as well as Medford, Rogue Valley, Willamette Valley, Southern Oregon, Central Oregon, Nevada, Washington, Idaho, Utah, and Arizona.