Evaluated the existing HVAC system at the Red Bluff City ...read more »Hall. Evaluated deficiencies and prepared a report including up to three proposed HVAC system solution recommendations, including cost estimates and proposed construction sequences. « read less
Electrical and fire alarm system design for the Humboldt Cou...read more »nty Office of Education, Sequoia Conference Center located in Eureka, California. « read less
Bear River Band of Rhonerville Rancheria - Tish-Non Health and Wellness Center Job 1351.00
Provided MEP design for the new 35,500-square-foot Bear...read more » River Tish-Non Health and Wellness Center in Loleta, California. Work included power distribution, rooftop photovoltaic system, and lighting design. « read less
Field investigation, power distribution design, and const...read more »ruction support for the installation of a new standby generator to serve specific critical loads at the Gaia Shasta Resort located in Anderson, California. « read less
NIC Industries Polymer Design Assistance Job 1372.00
ArcSine provided services to evaluate, design, and assist...read more »e with supervision of construction and commissioning of a proprietary production facility in White City, Oregon.
Project goals included:
Define criteria
Develop a pilot continuous-process manufacturing system
Refine and scale-up to construct continuous-process manufacturing facilities
Recover ammonia to the extent practical/desired
Identify patent opportunities, and develop documentation in support of them
« read less
ArcSine Engineering’s MEP Revit design services includ...read more »ed:
Power Distribution
· A 1,400 amp 480/277-volt service entrance and power distribution.
· A 500KW standby generator and segregated power distribution system, with multiple fuel sources.
· A 100kVA uninterruptible power supply for building-wide critical loads.
Mechanical/Plumbing Design
· Variable Air Volume (VAV) HVAC system with a 120-ton rooftop unit.
· Redundant ductless split systems to serve critical data/server rooms.
· Heating hot water system consisting of two modulating condensing boilers with variable speed primary/secondary pumping piped to reheat coils at the VAV boxes.
· Plumbing systems, including water, waste, vent, compressed air, parking structure drains, and roof drains.
Lighting Design
· LED general lighting.
· Exit, emergency, and egress lighting meeting NFPA Fire and Life Safety requirements.
· Site lighting.
Other
· Building-wide intrusion, access control, and video.
· Building-wide networking.
· Wireless access points throughout the building.
· Extensive security and specialty provisions.
· Fire alarm system and sprinkler system.
· Central Vacuum System
· Mechanical, electrical, and plumbing designs were coordinated to meet LEED Silver objectives.
« read less
Jackson County District Attorney's Office Building Job 1504.00
Electrical, lighting, and mechanical (HVAC and plumbing) des...read more »ign for an approximately 20,000-square-foot office building for the District Attorney's Office, located in Medford, Oregon. « read less
Electrical, lighting, and mechanical (HVAC and plumbing) des...read more »ign for a 5,200-square-foot court house located in Central Point, Oregon. « read less
Bear River Band of Rhonerville Rancheria - Recreation Center, Phase 2 Job 1506.00
Power distribution, lighting design, HVAC, and plumbing desi...read more »gn for the construction of a new 23,700-square-foot two-story recreation center, located in Loleta, California. « read less
Yuba City Wastewater Treatment Facility Improvements Job 1512.00
On-call task order contract for ongoing engineering support ...read more »at an in-service wastewater treatment facility. Work included design of: high purity oxygen generation system, new secondary clarifier, rehabilitation of three existing clarifiers, new digested sludge dewatering facility, and a facility-wide evaluation of electrical power distribution and instrumentation/controls systems. « read less
City of Medford Fire Stations 2, 3, and 4 Job 1516.00
Design of MEP systems for three new fire stations:
Station ...read more »#2: 10,000-square-feet
Station #3: 12,000-square-feet
Station #4: 12,000-square-feet « read less
Einstein Bagels - Southern Oregon University Job 1549.00
Tenant Improvement to an existing Subway Restaurant space to...read more » convert into an Einstein Bagel outlet. The space is located in the Southern Oregon University Stevenson Building Food Court. Provided MEP services. « read less
Expansion of an existing 24kW Photovoltaic (PV) system to in...read more »clude an additional 28kW PV system in Loma Rica, California. The existing 24kW PV system consists of: One hundred and eight 235W modules (3 modules per string, 6 strings per combiner box), six combiner boxes, six charge controllers, a battery bank, and three inverters feeding back to the main switchboard.
The additional 28kW PV system consists of the following: Ninety-three 310W modules (3 modules per string, 6 strings per combiner box), six combiner boxes, six charge controllers and four inverters feeding back to the main switchboard.
ArcSine developed three-line diagrams of the existing system and the new system with associated calculations suitable for submission to the building department. « read less
Northern California & Oregon Engineering Company serving Redding, the Bay Area, and the surrounding Northern California area, as well as Medford, Rogue Valley, Willamette Valley, Southern Oregon, Central Oregon, Nevada, Washington, Idaho, Utah, and Arizona.