44 S. Central Avenue Apartment Complex Job 2229.00
Schematic design (SD) for power distribution and lighting mo...read more »difcations for the historic Palace Hotel (14,000 sq-ft), located at 44 S. Central Avenue in Medford, Oregon, which is being remodeled into an apartment housing building. The remodeled building will provide additional housing to the downtown Medfor area for low-income residents. « read less
Talent Mobile Estates Site Utilities and Street Lighting Job 2231.00
Power distribution, lighting, HVAC and plumbing design for t...read more »he remodel of an existing 2.500 square-foot clubhouse building for the Talent Mobile Estates located in Talent, Oregon. The project also included site power distribution to accommodate 90 manufactured home sites and associated roadway lighting design. « read less
This project included power distribution, lighting, HVAC, an...read more »d plumbing design for a new, three-story, 19,77 square-foot, multi-family apartment building in Arcata, CA. The project included design of a roof-mounted photovoltaic solar system.
« read less
Work included the electrical design for the downtown housing...read more » project located at the Boomtown Center of the City of Shasta Lake, California. The 65,000-square-foot, three-story housing project included two separate buildings, Building A, Building B, and City parking lots.
Key Items included:
- Design of new electric service for each building
- Design of power provisions for future electric vehicle charging stations
- Schematic design for photo-voltaic system for each building and parking lot area
« read less
Chiloquin (Oregon) High School Gymnasium Job 2240.00
Work included MEP design for Klamath County School District&...read more »#39;s new 17,000-square-foot Gymnasium at Chiloquin High School, located in Chiloquin, Oregon. The new gymnasium will include competition sized basketball courts, in addition to support spaces such as referee changing rooms, locker rooms, and a concessions room.
Utility coordination and design site utilities for power, telephone , and CAT
Design of power distribution system for gymnasium building
Design HVAC system for gymnasium building
Design building plumbing, waste and vent system for water/wastewater « read less
Bonanza (Oregon) High School Gymnasiuim Job 2241.00
Work included MEP design for Klamath County School District&...read more »#39;s new 17,000-square-foot Gymnasium at Bonanza High School, located in Bonanza, Oregon. The new gymnasium will include competition sized basketball courts, in addition to support spaces such as referee changing rooms, locker rooms, and a concessions room.
Utility coordination and design site utilities for power, telephone , and CAT
Design of power distribution system for gymnasium building
Design HVAC system for gymnasium building
Design building plumbing, waste and vent system for water/wastewater
Design of a new utility service to the Fire Pump System
Design of an Emergency Generator System to support the fire sprinkler fire pump system. « read less
Power distribution, lighting, HVAC, and plumbing design for ...read more »the new construction of an 8,000-square-foot, two-story office building for the Grants Pass Pregnancy Care Center in Grants Pas, Oregon. Project included parking lot lighting design, HVAC split-systems, peripheral system design support and complete services during construction. « read less
Work included Mechanical, Electrical, and Plumbing (MEP) des...read more »ign modifications to support a proposed Tenant Improvement at the Siskiyou Community Health Center.
Preparation of demolition drawings
Performed HVAC Calculations
Designed HVAC modifications
Designed Power distribution receptacle layout and data layout
Performed photometric analysis
Designed lighting and lighting controls
« read less
Siskiyou Community Health Center-Second Floor Improvements Job 2308.00
Mechanical, electrical, and plumbing (MEP design modificatio...read more »ns to support a tenant improvement at the Siskiyou Community Health Center (SCHC) building located in Grants Pass, Oregon.
Work included HVAC calculations, HVAC ductwork modifications, design of plumbing, drainage, and vent piping for new sinks in exam rooms. Power distribution and lighting demolition drawings, improvement drawings for receptacle and data outlets, improvement drawings for lighting and controls. « read less
Planning, design engineering, and construction support to re...read more »place the primary 115kV-12kV substation at the Central Contra Costa Sanitary District's Wastewater Treatment Plan in Martinez, California, with a new 12kV substation to be centrally located in the heart of the plant. Work included integrating 2 cogen and 2 12kV standby generators into the new substation, redistributing power to the subordinate 12kV substations located throughout the plant, and coordinating with PG&E to provide new redundant electrical services. « read less
On-call Engineering Support for the Central Contra Costa Cou...read more »nty Sanitary District, in Martinez, California, to provide electrical/instrumentation and controls/mechanical consultation for various pump station and treatment plan projects as identified by the District on an as-needed basis. « read less
Lower Klamath Nation Wildlife Refuge Pump Station Job 2424.00
Design service entrance and power distribution system for tw...read more »o new pump stations for the Ducks Unlimited Lower Klamath National Wildlife Refuge irrigation system. « read less
Northern California & Oregon Engineering Company serving Redding, the Bay Area, and the surrounding Northern California area, as well as Medford, Rogue Valley, Willamette Valley, Southern Oregon, Central Oregon, Nevada, Washington, Idaho, Utah, and Arizona.