Central Contra Costa Sanitary District (CCCSD)- Pump Station Improvements Job 1738.00
Electrical and I&C improvements to six pump stations and...read more » one metering station. Evaluated conversion from engine/electric-driven pumps to all electric-driven pumps at two pump stations. Develop as-built 3D/BIM visualizations of the pump stations for planning purposes. Performed a pre-design level of electrical and I&C improvements at all stations. Developed a pre-design summarizing recommendations. « read less
CCCSD Pump Station Improvements - Phase 1 Job 1738.01
Electrical, I&C, and communications/SCADA improvements t...read more »o three sewer pump stations and a flow metering station. Scope included tasks for assessing existing SCADA architecture District-wide (~20 stations) and recommending improvements. Two pump stations are converting from diesel engine-driven wet weather pumps to all-electric wet weather pumps (650-700 hp). « read less
Paradise Irrigation District - Pump Station Design Job 1750.00
ArcSine designed the electrical and instrumentation controls...read more » elements for a new distribution pump station and a replacement reservoir for the Paradise Irrigation District, located in Magalia, California. « read less
Electrical, I&C construction management for Guam Waterwo...read more »rks Authority's (GWA) SCADA Phase A-1 construction project. Included deep wells, reservoirs, booster pumping stations, sewer pumping stations, and a sewer treatment plan (~20 sites). This project implemented the first phase of what is ultimately envisioned to be an island-wide SCADA network for 400+ sites. « read less
Cloverdale Foothill Pump Station Soft Starter Replacement Job 1831.00
Procured, wired, configured, installed and tested one soft s...read more »tarter at the Foothill Pump Station located in Cloverdale, California. « read less
Yuba City Wastewater Treatment Facility - Programming Job 1848.00
Complete PLC and Supervisory Control and Data Acquisition (S...read more »CADA) programming support for a $20M upgrade to the City of Yuba City's primary wastewater treatment facility located in Yuba City, California. Project included replacment of seven Modicon Quantum PLC's with Allen Bradley Control Logix PLC's, programmed using Studio 5000 development software, replacement of single SCADA server with dual redundant servers operating on G.E. iFix supervisory software, and integration of a plantwide, self-healing Ehternet fiber ring network. « read less
Guam Waterworks Authority - Central Reservoirs Programming Job 1873.02
Performed programming, testing, and startup support for eigh...read more »t reservoir sites and three PRV sites for the Guam Waterworks Authority (GWA). The work consisted of developing control descriptions, programming new SCADAPack RTU's and developing screens for control panel OIP's as part of GWA's effort to implement an island-wide SCADA system for remote sites. « read less
Prepared a design change for two reservoir sites and a PRV s...read more »ite which combined electrical and I&C improvements from two separate projects into one project. Each project was design by separate consultants. « read less
Engineering services during bidding (SDB) and services durin...read more »g construction (SDC) for improvements to Paradise Irrigation District's primary water treatment plant in Magalia California. The improvements added a new pump station to the Zone A Plant effluent. « read less
Northern California & Oregon Engineering Company serving Redding, the Bay Area, and the surrounding Northern California area, as well as Medford, Rogue Valley, Willamette Valley, Southern Oregon, Central Oregon, Nevada, Washington, Idaho, Utah, and Arizona.