Performed a field investigation, prepared load calculations ...read more »and as-built drawings for utility power and standby power modifications for the Medford Service Center. This facility comprises of eleven buildings, housing four City departments (Public Works/Police/Water/Parks). Final contract documents included a design to individually submeter each of the four City departments individually. « read less
The Holly Theatre was constructed in Medford in 1930 and was...read more » an icon of Medford's downtown district. This stately theater brought families downtown to see the latest films and served as a catalyst for business activity. With an original seating capacity of 1,200, the Holly operated until 1986 when changes in the motion picture industry caused many single-screen movie houses to close. The Holly Theatre building has been recognized as having both national and statewide historic significance and is listed on the National Register of Historic Places. The Holly Theatre was built by noted Medford architect Frank C. Clark at an original cost of $100,000 in a Spanish Colonial Revival style. ArcSine Engineering was hired to provide electrical, mechanical, plumbing, and lighting design services for the restoration of this cherished landmark. « read less
Biggs-Gridley Memorial Hospital Chiller Project Job 1218.00
Electrical design for installation of a new 60-ton air-co...read more »oled chiller at the Biggs-Gridley Memorial Hospital located in Gridley, California. « read less
Provided a review and clarification of fire alarm design-bui...read more »ld quotes for the St. Mary's School of Performance and Athletic Center. Provided coordination between multiple contractors to equalize work and quotes. « read less
NASA-Ames Research Center - TP3 Arc Heater Job 1231.00
The Ames TP3 heater is an Arc heater which was relocated fro...read more »m Johnson Space Center, Houston, Texas to the Arc Jet complex, Aerodynamic Heating Facility (AHF) test bay at Ames Research Center in Moffett Field, California. This facility has been the R&D testing facility for tiles which have been used on space re-entry vehicles (shuttle).
ArcSine Engineering designed power distribution, motor controls, and hardwired safety relay logic for the Argon, nitrogen, oxygen, and CO2 gas systems, ventilation and exhaust systems of the test bay, test chamber, and basement area. ArcSine also performed all associated programming of the PLC and HMI screen development. « read less
First United Methodist Church - Lighting Job 1233.00
The First United Methodist Church (FUMC), located ...read more »in Redding, California, is modernizing portions of their existing building including the sanctuary. Modernization efforts include expanding the stage area, and upgrading sound, electrical power, and both house and theatrical lighting systems. « read less
New construction, mixed-use building in downtown Ashland, Or...read more »egon.
1st floor: Restaurant and wine tasting
2nd floor: Six hotel units
3rd floor: Six condominium units
« read less
Napa Sanitation District - Aerator Addition Job 1266.00
Planning and design of aeration system for 100 acre treatmen...read more »t pond system. Included integration with plant control system. Electrical loads were separated by 12-KV overhead distribution and 12-KV to 480-volt unit substation sized for this project as well as permanent sludge dredge and conveyance system. « read less
Northern California & Oregon Engineering Company serving Redding, the Bay Area, and the surrounding Northern California area, as well as Medford, Rogue Valley, Willamette Valley, Southern Oregon, Central Oregon, Nevada, Washington, Idaho, Utah, and Arizona.