City of San Francisco - SCADA Design and Construction Job 9206.00
Field investigation, developed comprehensive points list, an...read more »d prepared master planning documentation for 300 remote sites. Design of power, instrumentation and controls, and RTUs for 150 of the sites. Remote sites communicate with four central sites via telephone, radio, and satellite communications to provide total water system monitoring and remote control capability. « read less
Placer County - Meadow Vista Landfill - Gas Job 9412.00
Designed electrical, lighting, and instrumentation and contr...read more »ols for landfill gas extraction. Included blowers, flare, and leachate pumping. « read less
City of Redding - Benton Landfill - Gas Job 9412.02
Designed electrical, lighting, and instrumentation and contr...read more »ols for landfill gas extraction. Included blowers, flare, and leachate pumping. « read less
Designed electrical, lighting, and instrumentation and contr...read more »ols for landfill gas extraction. Included blowers, flare, and leachate pumping. « read less
Designed electrical, lighting, and instrumentation and contr...read more »ols for landfill gas extraction. Included blowers, flare, and leachate pumping. « read less
NASA-Ames Research Center - Vertical Motion Simulator (VMS) Job 9614.00
NASA's Vertical Motion Simulator (VMS) is a state-of-the...read more »-art man-rated flight simulator used for research on vertical take-off vehicles (VTOL) and space shuttle landing training. ArcSine Engineering provided design, construction management, and startup and acceptance testing for two major simulator projects. ArcSine's scope of work included maintenance and improvements for drive and building power, dc drives, ac drives, hydraulic drives, failsafe hardwired safety systems, and feedback control systems. « read less
As part of design of new and upgraded facilities, designed n...read more »ew programmable controls. Projects include the following: • Martinez Pumping Station, Orinda Crossroads Pumping Station,Moraga Pumping Station, San Ramon Pumping Station, Lower Orinda Pumping Station « read less
EBMUD - Point Isabel Treatment Plant - Pumping Station Job 9823.00
Designed new programmable controls and modifications to, and...read more » interfaces with, the District’s distributed control system (DCS) as part of design of new and upgraded facilities. Projects include the following: Point Isabel Treatment Plant/Pump Station “N” consolidation, Pumping Station “Q”, Pumping Station “G”, and Operations Building upgrade. « read less
As part of design of new and upgraded facilities, designed n...read more »ew programmable controls. Projects include the following: • Martinez Pumping Station, Orinda Crossroads Pumping Station,Moraga Pumping Station, San Ramon Pumping Station, Lower Orinda Pumping Station « read less
City of Brentwood - Water and Wastewater Facilities Job 9913.00
Design of electrical and control systems for new 10-mgd, $39...read more »-million facility, with complete provisions to support later plant upgrades. Included dual-redundant programmable control systems and plant-wide fiber-optic networks in self-healing configuration. « read less
Data acquisition prototype project. Planned, designed, and t...read more »ested state-of-the-industry remote data acquisition system for revenue metering. Project used Schneider Automation’s Modicon M340 Programmable Automation Controller (PAC). « read less
Northern California & Oregon Engineering Company serving Redding, the Bay Area, and the surrounding Northern California area, as well as Medford, Rogue Valley, Willamette Valley, Southern Oregon, Central Oregon, Nevada, Washington, Idaho, Utah, and Arizona.