ArcSine produced a Needs Assessment Report for the City whic...read more »h included an executive summary, overall location map, system block diagrams, project criteria and constraints, narrative descriptions, evaluation of existing telemetry methods and recommendations for improvements, and planning level cost estimating for the water treatment and storage facility (which includes a booster pump station), as well as the wastewater treatment facility (which includes three pump stations). « read less
ArcSine produced a Needs Assessment Report for the City whic...read more »h included an executive summary, overall location map, system block diagrams, project criteria and constraints, narrative descriptions, evaluation of existing telemetry methods and recommendations for improvements, and planning level cost estimating for the water treatment and storage facility (which includes a booster pump station), as well as the wastewater treatment facility (which includes three pump stations). « read less
ArcSine produced a Needs Assessment Report for the City whic...read more »h included an executive summary, overall location map, system block diagrams, project criteria and constraints, narrative descriptions, evaluation of existing telemetry methods and recommendations for improvements, and planning level cost estimating for the water treatment and storage facility (which includes a booster pump station), as well as the wastewater treatment facility (which includes three pump stations). « read less
Biochar Global Solutions - Conceptual Design Job 1024.00
Evaluation and preliminary design for activated carbon and c...read more »ogeneration facility. ArcSine disciplines included electrical, instrumentation and controls, and package system integration. « read less
Gilbert Park Professional Center - LEED Certification Design Job 1040.00
Core and shell—LEED project, included site utility coo...read more »rdination and design; power distribution and lighting design; emergency lighting; HVAC system design; plumbing design; building exterior, parking lot, and site lighting; LEED certification including water efficiency, energy, and atmosphere; coordination with government agencies; Services During Bid; and Services During Construction. « read less
Northern California & Oregon Engineering Company serving Redding, the Bay Area, and the surrounding Northern California area, as well as Medford, Rogue Valley, Willamette Valley, Southern Oregon, Central Oregon, Nevada, Washington, Idaho, Utah, and Arizona.