Project Details
Abbey of New Clairvaux
Job: 0307.00
City: | Vina |
---|---|
State: | CA |
Type of Work: | |
Type of Facility: | |
Type of Systems: | |
File/Sheet: | Additional Information Available for Download/Viewing: Abbey_of_New_Clairvaux.pdf 591.8 KB |
File/Sheet: | Additional Information Available for Download/Viewing: Houses_of_Worship.pdf 297.4 KB |
Details: Master planning and site-wide power distribution for a campus of eight existing buildings and nine planned buildings totaling 55,000 square feet. This renovation plus new construction project used Cistercian architecture and original stones from a 12th Century Spanish monastery. The project included period lighting with fiber optic fountain lighting, as well as a 600kW standby generator system. |