Project Details
7 X 10 Wind Tunnel Drive
Job: 0474.00
City: | Moffett Field |
---|---|
State: | CA |
Type of Work: | |
Type of Facility: | |
Type of Systems: | |
Details: Furnished, installed, and programmed a PLC system which controlled the air system valving and temperature control of the wind tunnel. |