Project Details
7 X 10 Wind Tunnel Drive
Job: 0474.00
| City: | Moffett Field |
|---|---|
| State: | CA |
| Type of Work: | |
| Type of Facility: | |
| Type of Systems: | |
| Details: Furnished, installed, and programmed a PLC system which controlled the air system valving and temperature control of the wind tunnel. |
|
