Project Details
Gibraltar Pump Station
Job: 0725.00
City: | Milpitas |
---|---|
State: | CA |
Type of Work: | |
Type of Facility: | |
Type of Systems: | |
![]() |
Additional Information Available for Download/Viewing: 0725.00_Hazardous_Gas_Detection.pdf 132.5 KB |
Details: Developed three upgrade options and ultimate design of the chosen options for the Gibraltar Pump Station. Also conducted field investigation and coordination with the electric utility for shutdowns to determine actual capacity of the existing switchgear and utility feeder bussing. Design work required to provide for future additions. |