Einstein Bagels - Southern Oregon University Job 1549.00
Tenant Improvement to an existing Subway Restaurant space to...read more » convert into an Einstein Bagel outlet. The space is located in the Southern Oregon University Stevenson Building Food Court. Provided MEP services. « read less
Expansion of an existing 24kW Photovoltaic (PV) system to in...read more »clude an additional 28kW PV system in Loma Rica, California. The existing 24kW PV system consists of: One hundred and eight 235W modules (3 modules per string, 6 strings per combiner box), six combiner boxes, six charge controllers, a battery bank, and three inverters feeding back to the main switchboard.
The additional 28kW PV system consists of the following: Ninety-three 310W modules (3 modules per string, 6 strings per combiner box), six combiner boxes, six charge controllers and four inverters feeding back to the main switchboard.
ArcSine developed three-line diagrams of the existing system and the new system with associated calculations suitable for submission to the building department. « read less
Design, procurement, programming, testing, and commissioning...read more » of a replacement Supervisory Control and Data Acquisition (SCADA) system at Iron Mountain Mines, a US EPA Superfund Site located near Redding, California. Replacement system consists of redundant, geographically separated servers, and three operator workstations operating Wonderware Version 2014R2, with inter-server fiber backbone. Programming/configuration consisted of development of +/-90 graphics screens as well as integration with site GIS and CMMS programming. « read less
Performed a comprehensive audit of the the City of Modesto...read more »39;s existing water, wastewater, and storm water SCADA systems, which consisted of proprietary hardware and software developed by HSQ Technologies. City SCADA was comprised of a 20 year-old central computing infrastructure and remote devices at over 200 sites throughout the city. The Audit defined present and future SCADA requirements, and evaluated and decided how to best meet those requirements. ArcSine's Audit developed a roadmap which clearly defined the sequence, timing, costs, staffing and other aspects of the SCADA migration. ArcSine's work products were suitable for planning, budgeting, and usable by technical and managerial personnel. « read less
ArcSine provided electrical and lighting design for a new so...read more »ftball field at the Bear River Recreation Center located in Loleta, California. The project included field lighting, pathway lighting and a two-story building containing a snack bar, restrooms, announcer room, and storage buildings. « read less
Jackson County Corrections/Elections Building Remodel Job 1603.00
HVAC design for the remodel of 4,400-square-feet of off...read more »ice space and 1,220-square-feet of the Employee Clinic at the Jackson County (Oregon) Corrections/Elections Building located in Medford, Oregon. The existing single rooftop unit was replaced by three smaller rooftop units. « read less
Karuk Tribe Happy Camp Community Building Job 1605.00
Provided electrical and mechanical design for an 11,400-squa...read more »re-foot new Karuk Tribe Happy Camp Resident Center with High School athletic court, commercial kitchen, IT room, restrooms, computer lab, office, and exercise room. « read less
Electrical engineering support for decommissioning the Humbo...read more »ldt Bay Nuclear Power Plant. Support included electrical design and supporting calculations for phased decommissioning of various elements of the Humboldt Bay Power Plant. « read less
Northern California & Oregon Engineering Company serving Redding, the Bay Area, and the surrounding Northern California area, as well as Medford, Rogue Valley, Willamette Valley, Southern Oregon, Central Oregon, Nevada, Washington, Idaho, Utah, and Arizona.