The Holly Theatre was constructed in Medford in 1930 and was...read more » an icon of Medford's downtown district. This stately theater brought families downtown to see the latest films and served as a catalyst for business activity. With an original seating capacity of 1,200, the Holly operated until 1986 when changes in the motion picture industry caused many single-screen movie houses to close. The Holly Theatre building has been recognized as having both national and statewide historic significance and is listed on the National Register of Historic Places. The Holly Theatre was built by noted Medford architect Frank C. Clark at an original cost of $100,000 in a Spanish Colonial Revival style. ArcSine Engineering was hired to provide electrical, mechanical, plumbing, and lighting design services for the restoration of this cherished landmark. « read less
Provided a review and clarification of fire alarm design-bui...read more »ld quotes for the St. Mary's School of Performance and Athletic Center. Provided coordination between multiple contractors to equalize work and quotes. « read less
New construction, mixed-use building in downtown Ashland, Or...read more »egon.
1st floor: Restaurant and wine tasting
2nd floor: Six hotel units
3rd floor: Six condominium units
« read less
Electrical, lighting, mechanical, and plumbing design for th...read more »e Neighborhood Church of Redding, located in Redding, California. The project consists of one Worship Building with infracstructure and provisions for future buildout. The Worship Building is approximately 25,000 square feet, and includs space for a Sanctuary area as well as several rooms for support activities. « read less
Electrical and lighting design for the Karuk Tribal Wellness...read more » Center located in Yreka, California. The building in an 18,000-square-foot facility which will house a gymnasium large enough for a regulation basketball court, a men's and women's locker room, an exercise room, a commercial kitchen, and office spaces. The building is to promote sustainability through energy efficient, environmentally friendly, and universally accessible design which is cost effective. « read less
Quail Park Memory Care Residences - HVAC Job 1329.00
Provided engineering services to prepare HVAC drawings, s...read more »uitable for permitting and for construction for the 25,569-square-foot Quail Park Memory Care facilities in Klamath Falls, Oregon. « read less
Evaluated the existing HVAC system at the Red Bluff City ...read more »Hall. Evaluated deficiencies and prepared a report including up to three proposed HVAC system solution recommendations, including cost estimates and proposed construction sequences. « read less
Bear River Band of Rhonerville Rancheria - Tish-Non Health and Wellness Center Job 1351.00
Provided MEP design for the new 35,500-square-foot Bear...read more » River Tish-Non Health and Wellness Center in Loleta, California. Work included power distribution, rooftop photovoltaic system, and lighting design. « read less
Power distribution design and construction support for the i...read more »nstallation of a new standby power systems to service specific critical loads at the Gaia Shasta Resort located in Anderson, California. « read less
Northern California & Oregon Engineering Company serving Redding, the Bay Area, and the surrounding Northern California area, as well as Medford, Rogue Valley, Willamette Valley, Southern Oregon, Central Oregon, Nevada, Washington, Idaho, Utah, and Arizona.