ArcSine Engineering’s MEP Revit design services includ...read more »ed:
Power Distribution
· A 1,400 amp 480/277-volt service entrance and power distribution.
· A 500KW standby generator and segregated power distribution system, with multiple fuel sources.
· A 100kVA uninterruptible power supply for building-wide critical loads.
Mechanical/Plumbing Design
· Variable Air Volume (VAV) HVAC system with a 120-ton rooftop unit.
· Redundant ductless split systems to serve critical data/server rooms.
· Heating hot water system consisting of two modulating condensing boilers with variable speed primary/secondary pumping piped to reheat coils at the VAV boxes.
· Plumbing systems, including water, waste, vent, compressed air, parking structure drains, and roof drains.
Lighting Design
· LED general lighting.
· Exit, emergency, and egress lighting meeting NFPA Fire and Life Safety requirements.
· Site lighting.
Other
· Building-wide intrusion, access control, and video.
· Building-wide networking.
· Wireless access points throughout the building.
· Extensive security and specialty provisions.
· Fire alarm system and sprinkler system.
· Central Vacuum System
· Mechanical, electrical, and plumbing designs were coordinated to meet LEED Silver objectives.
« read less
Provided mechanical engineering services to modify/add a hea...read more »ting, cooling, and ventilation air system for all rooms in the existing building. « read less
Bidwell Mansion Historical Site structural review. Doc...read more »umented all electrical and mechanical systems as-built. Identified deficiencies and code violations for the electrical and mechanical systems. Provided recommendations for corrections. « read less
Design of exhaust and make-up air systems for the remodel of...read more » the approximately 3,000-square-foot automotive service bays into a battery storage area. « read less
Electrical, lighting, and mechanical design for new construc...read more »tion of the 3,500-square-foot Rogue Credit Union, located in Roseburg, Oregon. « read less
Cascade Christian High School Computer Lab Job 1501.00
Design of a new HVAC system for the partial remodel of a med...read more »ia center into a 750-square-foot, 35 seat computer lab/classroom. « read less
Remodel of existing space for a new tofu production area. &n...read more »bsp;New roof-mounted HVAC systems with 100% outside air, gas heating, direct/indirect evaporative cooling, exhaust hoods and fans. « read less
Jackson County District Attorney's Office Building Job 1504.00
Electrical, lighting, and mechanical (HVAC and plumbing) des...read more »ign for an approximately 20,000-square-foot office building for the District Attorney's Office, located in Medford, Oregon. « read less
Electrical, lighting, and mechanical (HVAC and plumbing) des...read more »ign for a 5,200-square-foot court house located in Central Point, Oregon. « read less
Bear River Band of Rhonerville Rancheria - Recreation Center, Phase 2 Job 1506.00
Power distribution, lighting design, HVAC, and plumbing desi...read more »gn for the construction of a new 23,700-square-foot two-story recreation center, located in Loleta, California. « read less
Northern California & Oregon Engineering Company serving Redding, the Bay Area, and the surrounding Northern California area, as well as Medford, Rogue Valley, Willamette Valley, Southern Oregon, Central Oregon, Nevada, Washington, Idaho, Utah, and Arizona.