Performed a field investigation, prepared load calculations ...read more »and as-built drawings for utility power and standby power modifications for the Medford Service Center. This facility comprises of eleven buildings, housing four City departments (Public Works/Police/Water/Parks). Final contract documents included a design to individually submeter each of the four City departments individually. « read less
In Marin County, California, working alongside District s...read more »taff, ArcSine planned designed, and constructed a 40 site SCADA system. Included telephone, radio telemetry, a dedicated SCADA operations center, and extensive provisions to interface with and improve existing pumping control. « read less
Provided a review and clarification of fire alarm design-bui...read more »ld quotes for the St. Mary's School of Performance and Athletic Center. Provided coordination between multiple contractors to equalize work and quotes. « read less
NASA-Ames Research Center - TP3 Arc Heater Job 1231.00
The Ames TP3 heater is an Arc heater which was relocated fro...read more »m Johnson Space Center, Houston, Texas to the Arc Jet complex, Aerodynamic Heating Facility (AHF) test bay at Ames Research Center in Moffett Field, California. This facility has been the R&D testing facility for tiles which have been used on space re-entry vehicles (shuttle).
ArcSine Engineering designed power distribution, motor controls, and hardwired safety relay logic for the Argon, nitrogen, oxygen, and CO2 gas systems, ventilation and exhaust systems of the test bay, test chamber, and basement area. ArcSine also performed all associated programming of the PLC and HMI screen development. « read less
New construction, mixed-use building in downtown Ashland, Or...read more »egon.
1st floor: Restaurant and wine tasting
2nd floor: Six hotel units
3rd floor: Six condominium units
« read less
Napa Sanitation District - Aerator Addition Job 1266.00
Planning and design of aeration system for 100 acre treatmen...read more »t pond system. Included integration with plant control system. Electrical loads were separated by 12-KV overhead distribution and 12-KV to 480-volt unit substation sized for this project as well as permanent sludge dredge and conveyance system. « read less
Engineering design of electric power to and from new powe...read more »r supplies for a fiber glass manufacturing plant located in Willows, California. Mechanical engineering: determined cooling tower capacity and design of piping to supply two new power supplies and exisiting heat loads. « read less