Construction management and observation, and engineering ser...read more »vices during construction for a $4.5 million upgrade to the Dublin San Ramon Service District's (DSRSD) Field Operations Division Supervisory Control and Data Acquisition (SCADA) System covering 47 remote sites. On-site construction management over 80-week project duration, including site inspections, contractor coordination, scheduling, permit coordination, and related construction management services. « read less
Designs for replacement of aging electrical and motor c...read more »ontrols. Added manual transfer switch and receptacle for connection of a portable generator. « read less
Bear Republic Brewing Company - Cogeneration Job 1421.01
Provided utility coordination and assisted with design of pr...read more »ocess piping, controls and power interconnecting wore and conduit for a package treatment and micro turbine cogeneration system at this brewery. « read less
Lagunitas Brewing Company - Cogeneration Job 1421.02
Provided utility coordination and assisted with design of pr...read more »ocess piping, controls and power interconnecting wore and conduit for a package treatment and micro turbine cogeneration system at this brewery. « read less
ArcSine, working as a subconsultant to West Yost & Assoc...read more »iates, designed comprehensive upgrades to the Tulelake WWTP in Tulelake, California. Improvements consisted of new pumping systems for the influent and effluent pump stations, including new controls. Replacement of across-the-line aeration blowers with VFD-controlled blowers. Motorized gates for flow coordination, new weather station and data logger, new alarm auto dialer, and replacement of the standby generator system. « read less
Water system improvement project intended to segregate priva...read more »te Special Use Permit (SUP) holders from the water distribution system operated by the US Forest Services (including two well sites, a storage tank, and distribution piping) serving two Forest Service campgrounds. « read less
City of Redding - Foothill Water Treatment Plan Improvements Job 1480.00
This project designed improvements to an essential in-servic...read more »e water treatment plan in the City of Redding, California. Improvements included electrical and instrumentation/controls modifications to support: individual filter from monitory and control for each of four filters; the addition of a Filter-to-Waste System; and the construction of a second spent washwater equalization basin. « read less
Yuba City Wastewater Treatment Facility Improvements Job 1512.00
On-call task order contract for ongoing engineering support ...read more »at an in-service wastewater treatment facility. Work included design of: high purity oxygen generation system, new secondary clarifier, rehabilitation of three existing clarifiers, new digested sludge dewatering facility, and a facility-wide evaluation of electrical power distribution and instrumentation/controls systems. « read less
Performed a comprehensive audit of existing water, wastewate...read more »r, and storm water SCADA systems, which consisted of proprietary hardware and software developed by HSQ Technologies. SCADA was comprised of a 20 year-old central computing infrastructure and remote devices at over 200 sites. The Audit defined present and future SCADA requirements, and evaluated and decided how to best meet those requirements. ArcSine's Audit developed a roadmap which clearly defined the sequence, timing, costs, staffing and other aspects of the SCADA migration. ArcSine's work products were suitable for planning, budgeting, and usable by technical and managerial personnel. « read less
Electrical engineering support for decommissioning the Humbo...read more »ldt Bay Nuclear Power Plant. Support included electrical design and supporting calculations for phased decommissioning of various elements of the Humboldt Bay Power Plant. « read less
Novato Sanitary District - RWF Expansion Job 1617.00
ArcSine designed electrical and control system improvements ...read more »for improvements to the Novato Sanitary District's in-service Recycled Water Facility (RWF) to increase the Plant's capacity from 0.85 MGD to 2.55 MGD. « read less
ArcSine Engineering provided both engineering services durin...read more »g construction and complete PLC and SCADA programming for a major upgrade to increase the capacity of the Novato Sanitary District's primary Recycled Water Facility, located in Novato, California. « read less
ArcSine provided electrical and control system engineering s...read more »upport for water system improvements for the City of Tulelake, California. Improvements included a complete rehabilitation of the Well No. 1 site, the addition of a standby generator at Booster Pump Station No. 1, including an Automatic Transfer Switch (ATS), the addition of a standby generator and ATS at Well No. 3, the addition of an ATS at Lift Station No. 2, and consolidation of the power distribution system at the corporation yard (BPS, Well No. 1, and Lift Station No. 1). « read less