Einstein Bagels - Southern Oregon University Job 1549.00
Tenant Improvement to an existing Subway Restaurant space to...read more » convert into an Einstein Bagel outlet. The space is located in the Southern Oregon University Stevenson Building Food Court. Provided MEP services. « read less
Expansion of an existing 24kW Photovoltaic (PV) system to in...read more »clude an additional 28kW PV system in Loma Rica, California. The existing 24kW PV system consists of: One hundred and eight 235W modules (3 modules per string, 6 strings per combiner box), six combiner boxes, six charge controllers, a battery bank, and three inverters feeding back to the main switchboard.
The additional 28kW PV system consists of the following: Ninety-three 310W modules (3 modules per string, 6 strings per combiner box), six combiner boxes, six charge controllers and four inverters feeding back to the main switchboard.
ArcSine developed three-line diagrams of the existing system and the new system with associated calculations suitable for submission to the building department. « read less
ArcSine provided electrical and lighting design for a new so...read more »ftball field at the Bear River Recreation Center located in Loleta, California. The project included field lighting, pathway lighting and a two-story building containing a snack bar, restrooms, announcer room, and storage buildings. « read less
Karuk Tribe Happy Camp Community Building Job 1605.00
Provided electrical and mechanical design for an 11,400-squa...read more »re-foot new Karuk Tribe Happy Camp Resident Center with High School athletic court, commercial kitchen, IT room, restrooms, computer lab, office, and exercise room. « read less
Electrical engineering support for decommissioning the Humbo...read more »ldt Bay Nuclear Power Plant. Support included electrical design and supporting calculations for phased decommissioning of various elements of the Humboldt Bay Power Plant. « read less
Remodel of a 13,000-square-foot building. Included sit...read more »e investigations, demo drawings, power distribution, lighting design, and a security/access control system, along with a fire alarm performance specification. « read less
Novato Sanitary District - RWF Expansion Job 1617.00
ArcSine designed electrical and control system improvements ...read more »for improvements to the Novato Sanitary District's in-service Recycled Water Facility (RWF) to increase the Plant's capacity from 0.85 MGD to 2.55 MGD. « read less
ArcSine Engineering provided both engineering services durin...read more »g construction and complete PLC and SCADA programming for a major upgrade to increase the capacity of the Novato Sanitary District's primary Recycled Water Facility, located in Novato, California. « read less
ArcSine provided electrical and control system engineering s...read more »upport for water system improvements for the City of Tulelake, California. Improvements included a complete rehabilitation of the Well No. 1 site, the addition of a standby generator at Booster Pump Station No. 1, including an Automatic Transfer Switch (ATS), the addition of a standby generator and ATS at Well No. 3, the addition of an ATS at Lift Station No. 2, and consolidation of the power distribution system at the corporation yard (BPS, Well No. 1, and Lift Station No. 1). « read less
Northern California & Oregon Engineering Company serving Redding, the Bay Area, and the surrounding Northern California area, as well as Medford, Rogue Valley, Willamette Valley, Southern Oregon, Central Oregon, Nevada, Washington, Idaho, Utah, and Arizona.