DSRSD - Field Operations Facility-Electrical Improvements SDC/Construction Mgmt Job 1622.01
ArcSine provided engineering services during construction an...read more »d construction management for construction of electrical improvements to the Dublin San Ramon Services District's (DSRSD) operations Facility (FOF) in Pleasanton, CA. The project replaced the existing 1000-Amp service entrance, installed an 80kW emergency standby generator, including an automatic transfer switch (ATS), installed a 30kVA uninterruptable power supply (UPS) to provided redundant power to DSRSD's critical Supervisory and Data Acquisition (SCADA) system, installed a programmable logic controller (PLC) panel which interfaced with the District's 186Hz microwave backbone telemetry system and 4.9 GHz remote site radios, and a building-wide ArcFlash study. « read less
Lakeview Health Department - Medical Office Addition Job 1624.00
Prepared Schematic Design (SD) Engineering Reports for the e...read more »lectrical and mechanical building systems. Provided power distribution, lighting design, HVAC, and plumbing design for the Lake Health District Clinic expansion. Included new reception area, new coffee shop, and new building addition, plus lighting replacement for 9,620-square-feet of existing space. « read less
NASA-Ames Research Center is currently undergoing a NASA Con...read more »struction of Facilities (CofF) projects to replace the air-to-tube heat exchanger used to cool the heated gases that exhaust from the Aerodynamic Heating Facility (AHF) Arc Jet. ArcSine work included design, furnishing and installing, and testing electrical and controls integration aspects of the work. « read less
ArcSine performed a review of preliminary design and constru...read more »ction cost estimate for a 50kw photovoltaic (PV) system at the remote State Parks' Malakoff Diggins site. « read less
MEP design for the new construction of a 6,500-square-foot b...read more »uilding. Two individually metered tenants - Rogue Credit Union Bank and Post Office/Video store. « read less
MEP design of a two-story 4,000-square-foot addition to an e...read more »xisting 5,500-square-foot home. Facility will be operated by the "Friends of Hospice". Project included the addition of eight new suites with private bathrooms and a two-story elevator. This was the primary residence of Harry Holmes of the Harry & David business. « read less
Red Bluff City Hall - Boiler/Chiller Replacement Job 1634.00
Provided engineering design and bidding assistance services ...read more »necessary for the replacement of the existing Chiller and condenser units (air conditioning), and the Boiler (heating equipment) at the Red Bluff City Hall complex. « read less
Remodel to the existing Carnegie Library located in Lakeport...read more », California. Project added an elevator, new restrooms and entry. Project included MEP services. « read less
Rogue Credit Union - South Admin Expansion Job 1645.00
Power distribution, lighting, plumbing, and HVAC for a core/...read more »shell building for administrative services for Rogue Credit Union. Provided infrastructure for standby generator power to the facility, for owner-selected systems only. « read less
Preparation of design-build mechanical (HVAC only) and elect...read more »rical performance specifications for the Kids Unlimited project located in Medford, Oregon. « read less
Las Gallinas Valley Sanitation District Secondary Improvements Support - SDB/SDC Job 1663.03
Provided design review support and value engineering on beha...read more »lf of the District and performed coordination with Contractor during construction for electrical and control systems. « read less
Northern California & Oregon Engineering Company serving Redding, the Bay Area, and the surrounding Northern California area, as well as Medford, Rogue Valley, Willamette Valley, Southern Oregon, Central Oregon, Nevada, Washington, Idaho, Utah, and Arizona.