Performed a comprehensive audit of the the City of Modesto...read more »39;s existing water, wastewater, and storm water SCADA systems, which consisted of proprietary hardware and software developed by HSQ Technologies. City SCADA was comprised of a 20 year-old central computing infrastructure and remote devices at over 200 sites throughout the city. The Audit defined present and future SCADA requirements, and evaluated and decided how to best meet those requirements. ArcSine's Audit developed a roadmap which clearly defined the sequence, timing, costs, staffing and other aspects of the SCADA migration. ArcSine's work products were suitable for planning, budgeting, and usable by technical and managerial personnel. « read less
Novato Sanitary District - RWF Expansion Job 1617.00
ArcSine designed electrical and control system improvements ...read more »for improvements to the Novato Sanitary District's in-service Recycled Water Facility (RWF) to increase the Plant's capacity from 0.85 MGD to 2.55 MGD. « read less
ArcSine Engineering provided both engineering services durin...read more »g construction and complete PLC and SCADA programming for a major upgrade to increase the capacity of the Novato Sanitary District's primary Recycled Water Facility, located in Novato, California. « read less
DSRSD - Field Operations Facility-Electrical Improvements SDC/Construction Mgmt Job 1622.01
ArcSine provided engineering services during construction an...read more »d construction management for construction of electrical improvements to the Dublin San Ramon Services District's (DSRSD) operations Facility (FOF) in Pleasanton, CA. The project replaced the existing 1000-Amp service entrance, installed an 80kW emergency standby generator, including an automatic transfer switch (ATS), installed a 30kVA uninterruptable power supply (UPS) to provided redundant power to DSRSD's critical Supervisory and Data Acquisition (SCADA) system, installed a programmable logic controller (PLC) panel which interfaced with the District's 186Hz microwave backbone telemetry system and 4.9 GHz remote site radios, and a building-wide ArcFlash study. « read less
Dublin San Ramon Services District - Lift Station LS1 Radio Path Study Job 1650.00
ArcSine performed field radio testing using a 4.9 Coltz ...read more »;Subscriber module and access point, to verify a suitable radio path to integrate a remote lift station site into the District's SCADA system. The field testing identified the location (site) on the District's 186GHz microwave backbone ring best suited to receive the lift station telemetry. ArcSine's deliverables consisted of a report which include radio test data. « read less
Las Gallinas Valley Sanitation District Secondary Improvements Support - SDB/SDC Job 1663.03
Provided design review support and value engineering on beha...read more »lf of the District and performed coordination with Contractor during construction for electrical and control systems. « read less
Bella Vista Water District - Telemetry Replacement Job 1702.00
Downloaded new GE MDS Orbit radio software onto District-sup...read more »plied laptop and trained BVWD staff on programming the new radios. Assisted Bella Vista Water District (BVWD) in configuring all the radios at the BVWD Water Treatment Facility. Helped BVWD develop a strategy to complete installation and testing of radios. Developed basic test procedures and set up troubleshooting scenarios. « read less
Yuba City Digester, Dewatering, and Electrical Facility Improvements Job 1703.00
ArcSine performed detailed evaluations of the Plant Instrume...read more »ntation, Control Systems, and Power Distribution Systems in support of developing Technical Memoranda (TM) recommending proposed improvements. Collaborative workshops with the City resulted in decisions comprising the basis for the ultimate design scope. ArcSine's design included replacement of five site distribution 12kV transformers and associated substations, wholesale process and electrical improvements to the headworks, digester, and sludge dewatering processes, including new 480-volt MCC's, demolition and replacement of aging MCC's in the Grit, Return Activated Sludge (RAS) and chlorine processes, integration of a new Secondary Clarifier (electrical and controls), and design of 4 new plant PLC control panels. « read less
Yuba City - On-Call Engineering Support Job 1730.00
Multi-year on-call contract with the City of Yuba City to pr...read more »ovide electrical, control system, and mechanical engineering support, and programming and construction management services as requested by the City. « read less
Central Contra Costa Sanitary District (CCCSD)- Pump Station Improvements Job 1738.00
Electrical and I&C improvements to six pump stations and...read more » one metering station. Evaluated conversion from engine/electric-driven pumps to all electric-driven pumps at two pump stations. Develop as-built 3D/BIM visualizations of the pump stations for planning purposes. Performed a pre-design level of electrical and I&C improvements at all stations. Developed a pre-design summarizing recommendations. « read less
CCCSD Pump Station Improvements - Phase 1 Job 1738.01
Electrical, I&C, and communications/SCADA improvements t...read more »o three sewer pump stations and a flow metering station. Scope included tasks for assessing existing SCADA architecture District-wide (~20 stations) and recommending improvements. Two pump stations are converting from diesel engine-driven wet weather pumps to all-electric wet weather pumps (650-700 hp). « read less
Northern California & Oregon Engineering Company serving Redding, the Bay Area, and the surrounding Northern California area, as well as Medford, Rogue Valley, Willamette Valley, Southern Oregon, Central Oregon, Nevada, Washington, Idaho, Utah, and Arizona.