Contra Costa Water District - Revenue Metering/Data Acquisition Job 0877.00
Revenue metering data acquisition project. Planned, designed...read more », and implemented a state-of-the-industry remote data acquisition system for revenue metering. Project used Control Microsystems’ SCADAPack 350 PLC. « read less
Provided comprehensive control system programming services f...read more »or a major upgrade to the City’s primary water treatment facility. Included provisions for integration with future City-wide SCADA system software for the City’s water collection, treatment, and distribution system. Integration of data acquisition and controls for nine remote sites, including a raw water pump station, five reservoirs, and three pressure-relief valves. Work included: HMI programming; PLC programming; radio telemetry with multiple remote sites; for a total of 11 PLCs, 30 SCADA screens, and 9 remote sites. « read less
ArcSine produced a Needs Assessment Report for the City whic...read more »h included an executive summary, overall location map, system block diagrams, project criteria and constraints, narrative descriptions, evaluation of existing telemetry methods and recommendations for improvements, and planning level cost estimating for the water treatment and storage facility (which includes a booster pump station), as well as the wastewater treatment facility (which includes three pump stations). « read less
ArcSine produced a Needs Assessment Report for the City whic...read more »h included an executive summary, overall location map, system block diagrams, project criteria and constraints, narrative descriptions, evaluation of existing telemetry methods and recommendations for improvements, and planning level cost estimating for the water treatment and storage facility (which includes a booster pump station), as well as the wastewater treatment facility (which includes three pump stations). « read less
ArcSine produced a Needs Assessment Report for the City whic...read more »h included an executive summary, overall location map, system block diagrams, project criteria and constraints, narrative descriptions, evaluation of existing telemetry methods and recommendations for improvements, and planning level cost estimating for the water treatment and storage facility (which includes a booster pump station), as well as the wastewater treatment facility (which includes three pump stations). « read less
De-Ionized Water Pump Station Automation Job 0942.00
Designed a 13.8kV to 4.16kV double-ended substation to po...read more »wer five 2,000-hp pumps for the cooling water system at the Arc-Jet wind tunnel facility. Designed power distribution and motor control. « read less
Northern California & Oregon Engineering Company serving Redding, the Bay Area, and the surrounding Northern California area, as well as Medford, Rogue Valley, Willamette Valley, Southern Oregon, Central Oregon, Nevada, Washington, Idaho, Utah, and Arizona.