City of Brentwood - City-Wide SCADA System Job 0014.00
Design of a 28-site water SCADA system, complete. The projec...read more »t included identifying and documenting the ultimate system, then optimizing the initial project to meet budgetary constraints. Included system-wide instrumentation upgrades, and integration among City enterprises. « read less
Power distribution and lighting design for a remodel of an e...read more »xisting 22,000-square-foot hospital (built in 1950) into office spaces. In addition, this design included field investigation, replacement of the existing 1,600A main breaker, power and lighting design for a new parking lot, and compliance with current Title 24 standards. « read less
Design of a 15,000-square-foot upscale office building. P...read more »roject criteria included use of sustainable materials and designs. Lighting system was designed around the use of natural lighting and programmable lighting control panels. These utilize inputs from an astronomical time clock, photocells, occupancy sensor, low-voltage switching, and control programs. Lighting controls were integrated with HVAC supervisory controls. « read less
Electrical and lighting design for the restoration of a 1,00...read more »0-seat, 1930’s era, art deco style movie house/theatre. ArcSine’s design for this challenging and rewarding project included extensive field investigation to understand the original electrical system and the changes that had been made over the years; electrical demolition work by our staff to ensure that selected raceways could be reused; careful, detailed planning of new electrical system components to minimize impact to the building’s original construction; period lighting design; and programming and startup of the building lighting control system. Included sound and theatrical lighting systems. « read less
Sacramento Regional County Sanitation District - SWGR 2E/2F Replacement Design Job 0126.02
ArcSine Engineering was the lead consultant on evaluation an...read more »d design of replacement electrical systems for the 700-million-gallons-per-day influent pumping station at the Sacramento Regional Wastewater Treatment Plant. The project included a new 32 MVA substation and 4kV motor control centers, feeding 17,500 horsepower of load. Systems are fully redundant and serviceable. New equipment is housed in a 4,050-square-foot building, fully integrated with site plumbing, HVAC, communications, fire protection, and alarm systems. Building and landscape architecture complement surrounding facilities. The design also included use-change of the existing 1,400-square-foot switchgear room to provide office infrastructure. « read less
Frank Hagel Federal Building - Chilled Water System Job 0205.00
ArcSine Engineering completed services for the Frank Hagel F...read more »ederal Building in Richmond, California, including cost estimating, electrical engineering, field work, mechanical engineering, and plumbing & piping services. « read less
City of Chico - Downtown Transit Center - Photovoltaics Job 0217.00
Designed a net metering photovoltaic system for a bus ticket...read more » center in Chico, California. Photovoltaic panels were installed as roof canopies over the main ticket center, and over three satellite bus stops. The panels were custom designed and fabricated using photovoltaic cells laminated between glass sheets. The individual cells were arranged in a geometric pattern allowing natural light to pass between the cells. This was a high-profile demonstration project for the City of Chico, intended to raise awareness of alternative energy solutions. While the project was of modest electrical capacity, it incorporated challenging issues usually found on much larger projects. « read less
NASA Ames Research Center - 20MW Power Supply Design Job 0227.00
The NASA-Ames Arc Jet Complex, located in Moffett Field, Cal...read more »ifornia, has provided over 40 years of thermal protection system testing for every NASA space transportation vehicle. ArcSine Engineering was the design engineer and contractor for the removal, rewind, and reinstallation and commission of a saturable reactor and transformer pair, one power system of five module sets which are part of the 20-MW power supply. « read less
Complete electrical and lighting design for a new outdoor am...read more »phitheater. Included a projection building, a screen building, area and path lighting, and a theatrical lighting system with programmed control system. « read less
Complete electrical and lighting design for a new floatin...read more »g complex, including gas docks, moorage, service centers, rental offices, and store. « read less
Turtle Bay Arboretum - Peripheral Systems Job 0302.00
Coordination and design of site utilities for a 25-acre n...read more »ature complex. Designed power, lighting, and peripheral systems for the west gatehouse building and 3,000-square-foot nursery building, with specialized climate controls. « read less
Master planning and site-wide power distribution for a campu...read more »s of eight existing buildings and nine planned buildings totaling 55,000 square feet. This renovation plus new construction project used Cistercian architecture and original stones from a 12th Century Spanish monastery. The project included period lighting with fiber optic fountain lighting, as well as a 600kW standby generator system. « read less