Additional information for this project is available for download.
Select as many variables as you want below to fit the types of projects you want to see.
Showing page 1 of 18 (1~15 of 261) 123456789 ... 18
Project Name
City
State
Work Type(s)
Facility Type(s)
System Type(s)
Central Valley High School - Modernization Job 0006.00
Design for electrical, fire alarm, and lighting rehabilitati...read more »on for over 100,000 square feet of high school campus buildings. Fire alarm design provided for a new addressable system campus-wide. Electrical design included refurbishing power distribution equipment and providing a system of raceways campus-wide for future expansion of communications and computer networking systems. « read less
Sacramento Regional County Sanitation District - SWGR 2E/2F Replacement Design Job 0126.02
ArcSine Engineering was the lead consultant on evaluation an...read more »d design of replacement electrical systems for the 700-million-gallons-per-day influent pumping station at the Sacramento Regional Wastewater Treatment Plant. The project included a new 32 MVA substation and 4kV motor control centers, feeding 17,500 horsepower of load. Systems are fully redundant and serviceable. New equipment is housed in a 4,050-square-foot building, fully integrated with site plumbing, HVAC, communications, fire protection, and alarm systems. Building and landscape architecture complement surrounding facilities. The design also included use-change of the existing 1,400-square-foot switchgear room to provide office infrastructure. « read less
NASA Ames Research Center - 20MW Power Supply Design Job 0227.00
The NASA-Ames Arc Jet Complex, located in Moffett Field, Cal...read more »ifornia, has provided over 40 years of thermal protection system testing for every NASA space transportation vehicle. ArcSine Engineering was the design engineer and contractor for the removal, rewind, and reinstallation and commission of a saturable reactor and transformer pair, one power system of five module sets which are part of the 20-MW power supply. « read less
Complete electrical and lighting design for a new floatin...read more »g complex, including gas docks, moorage, service centers, rental offices, and store. « read less
Designed a 9,000-seat multi-use event center with two restau...read more »rants and bars and one cafe for the Fort Mojave Indian Tribe. The design included a 12.47-kV distribution system and a 2.5-MVA substation with redundant primary supply, as well as design of infrastructure for events including concerts, sporting events, rodeos, trade shows, motocross, and monster trucks. « read less
California State Parks - Boucher Hill Lookout Tower Job 0409.00
Palomar Mountain State Park. Multiyear task order contracts ...read more »including field investigations, engineering and consultation, and upgrade designs to provide upgrades. « read less
California State Parks - Boucher Hill Fire Lookout Job 0409.00
Boucher Hill Fire Lookout is located in the Palomar Mountain...read more » State Park in North San Diego County. The tower was originally constructed in 1948 and consists of a 16'x16' base with a 30' tall tower. ArcSine was contracted to perform multiyear task order contracts and performed a field investigation and assessment of the existing power distribution and it's infrastructure and upgrade designs. « read less
Harbor Sanitary District - Pump Station 14 Job 0423.00
Designed electrical and instrumentation and controls systems...read more » for the replacement of the District’s primary wastewater pump station. « read less
Designed a 13.8kV to 4.16kV double-ended substation to po...read more »wer five 2,000-hp pumps for the cooling water system at the Arc-Jet wind tunnel facility. Designed power distribution and motor control. « read less
Northern California & Oregon Engineering Company serving Redding, the Bay Area, and the surrounding Northern California area, as well as Medford, Rogue Valley, Willamette Valley, Southern Oregon, Central Oregon, Nevada, Washington, Idaho, Utah, and Arizona.