Additional information for this project is available for download.
Select as many variables as you want below to fit the types of projects you want to see.
Showing page 1 of 48 (1~15 of 707) 123456789 ... 48
Project Name
City
State
Work Type(s)
Facility Type(s)
System Type(s)
Central Valley High School - Modernization Job 0006.00
Design for electrical, fire alarm, and lighting rehabilitati...read more »on for over 100,000 square feet of high school campus buildings. Fire alarm design provided for a new addressable system campus-wide. Electrical design included refurbishing power distribution equipment and providing a system of raceways campus-wide for future expansion of communications and computer networking systems. « read less
City of Brentwood - City-Wide SCADA System Job 0014.00
Design of a 28-site water SCADA system, complete. The projec...read more »t included identifying and documenting the ultimate system, then optimizing the initial project to meet budgetary constraints. Included system-wide instrumentation upgrades, and integration among City enterprises. « read less
Power distribution and lighting design for a remodel of an e...read more »xisting 22,000-square-foot hospital (built in 1950) into office spaces. In addition, this design included field investigation, replacement of the existing 1,600A main breaker, power and lighting design for a new parking lot, and compliance with current Title 24 standards. « read less
Design of a 15,000-square-foot upscale office building. P...read more »roject criteria included use of sustainable materials and designs. Lighting system was designed around the use of natural lighting and programmable lighting control panels. These utilize inputs from an astronomical time clock, photocells, occupancy sensor, low-voltage switching, and control programs. Lighting controls were integrated with HVAC supervisory controls. « read less
Sacramento Regional County Sanitation District - SWGR 2E/2F Replacement Design Job 0126.02
ArcSine Engineering was the lead consultant on evaluation an...read more »d design of replacement electrical systems for the 700-million-gallons-per-day influent pumping station at the Sacramento Regional Wastewater Treatment Plant. The project included a new 32 MVA substation and 4kV motor control centers, feeding 17,500 horsepower of load. Systems are fully redundant and serviceable. New equipment is housed in a 4,050-square-foot building, fully integrated with site plumbing, HVAC, communications, fire protection, and alarm systems. Building and landscape architecture complement surrounding facilities. The design also included use-change of the existing 1,400-square-foot switchgear room to provide office infrastructure. « read less
City of Chico - Downtown Transit Center - Photovoltaics Job 0217.00
Designed a net metering photovoltaic system for a bus ticket...read more » center in Chico, California. Photovoltaic panels were installed as roof canopies over the main ticket center, and over three satellite bus stops. The panels were custom designed and fabricated using photovoltaic cells laminated between glass sheets. The individual cells were arranged in a geometric pattern allowing natural light to pass between the cells. This was a high-profile demonstration project for the City of Chico, intended to raise awareness of alternative energy solutions. While the project was of modest electrical capacity, it incorporated challenging issues usually found on much larger projects. « read less
NASA Ames Research Center - 20MW Power Supply Design Job 0227.00
The NASA-Ames Arc Jet Complex, located in Moffett Field, Cal...read more »ifornia, has provided over 40 years of thermal protection system testing for every NASA space transportation vehicle. ArcSine Engineering was the design engineer and contractor for the removal, rewind, and reinstallation and commission of a saturable reactor and transformer pair, one power system of five module sets which are part of the 20-MW power supply. « read less
Complete electrical and lighting design for a new floatin...read more »g complex, including gas docks, moorage, service centers, rental offices, and store. « read less
Phillip Burton Federal Building & United States Courthouse Job 0245.00
Designed portions of the building-wide communications system...read more »s for several courtrooms in the 20-story, 1.14-million-square-foot Phillip Burton Federal Building in downtown San Francisco. The project required meticulous design of raceways and power distribution in courtrooms having historic, irreplaceable finishes. The project was complicated by rigorous security measures, limited access, and diverse opinions within the user group of high-ranking Federal judges. « read less
Turtle Bay Arboretum - Peripheral Systems Job 0302.00
Coordination and design of site utilities for a 25-acre n...read more »ature complex. Designed power, lighting, and peripheral systems for the west gatehouse building and 3,000-square-foot nursery building, with specialized climate controls. « read less
Master planning and site-wide power distribution for a campu...read more »s of eight existing buildings and nine planned buildings totaling 55,000 square feet. This renovation plus new construction project used Cistercian architecture and original stones from a 12th Century Spanish monastery. The project included period lighting with fiber optic fountain lighting, as well as a 600kW standby generator system. « read less
ArcSine Engineering completed power distribution, HVAC, plum...read more »bing, and lighting design for an 80-unit, three-and four-bedroom (10 buildings) site. This site also includes a 2,400-square-foot community building. « read less
Northern California & Oregon Engineering Company serving Redding, the Bay Area, and the surrounding Northern California area, as well as Medford, Rogue Valley, Willamette Valley, Southern Oregon, Central Oregon, Nevada, Washington, Idaho, Utah, and Arizona.