City of Brentwood - City-Wide SCADA System Job 0014.00
Design of a 28-site water SCADA system, complete. The projec...read more »t included identifying and documenting the ultimate system, then optimizing the initial project to meet budgetary constraints. Included system-wide instrumentation upgrades, and integration among City enterprises. « read less
Sacramento Regional County Sanitation District - SWGR 2E/2F Replacement Design Job 0126.02
ArcSine Engineering was the lead consultant on evaluation an...read more »d design of replacement electrical systems for the 700-million-gallons-per-day influent pumping station at the Sacramento Regional Wastewater Treatment Plant. The project included a new 32 MVA substation and 4kV motor control centers, feeding 17,500 horsepower of load. Systems are fully redundant and serviceable. New equipment is housed in a 4,050-square-foot building, fully integrated with site plumbing, HVAC, communications, fire protection, and alarm systems. Building and landscape architecture complement surrounding facilities. The design also included use-change of the existing 1,400-square-foot switchgear room to provide office infrastructure. « read less
Frank Hagel Federal Building - Chilled Water System Job 0205.00
ArcSine Engineering completed services for the Frank Hagel F...read more »ederal Building in Richmond, California, including cost estimating, electrical engineering, field work, mechanical engineering, and plumbing & piping services. « read less
NASA Ames Research Center - 20MW Power Supply Design Job 0227.00
The NASA-Ames Arc Jet Complex, located in Moffett Field, Cal...read more »ifornia, has provided over 40 years of thermal protection system testing for every NASA space transportation vehicle. ArcSine Engineering was the design engineer and contractor for the removal, rewind, and reinstallation and commission of a saturable reactor and transformer pair, one power system of five module sets which are part of the 20-MW power supply. « read less
Power distribution, lighting, communications, HVAC, and plum...read more »bing for a new Seven Crown Resorts marina on Shasta Lake, California. Offshore facilities included: Central Building (14,000 square feet),Shop Building (800 square feet), Sewage Pump-Out Building, Fuel Barge, Dock Lights, Marina Moorage (235 slips), Houseboat Fleet Moorage (40 slips), Moorage Metering Pedestals (100), Lift Station, Potable Water Distribution, Gray Water Distribution, Wastewater Distribution, Building HVAC. Onshore facilities included: U.S. Forest Service coordination; PG&E coordination; SBC coordination; design of Primary Metering; design of 12kV distribution with sectionalizing equipment and transformers; design of roadway and parking lot lighting (500 Stalls); design of power distribution and lighting design for restroom building; power distribution and controls for the wells and lift stations; design of SBC distribution. « read less
California State Parks - Boucher Hill Fire Lookout Job 0409.00
Boucher Hill Fire Lookout is located in the Palomar Mountain...read more » State Park in North San Diego County. The tower was originally constructed in 1948 and consists of a 16'x16' base with a 30' tall tower. ArcSine was contracted to perform multiyear task order contracts and performed a field investigation and assessment of the existing power distribution and it's infrastructure and upgrade designs. « read less
Harbor Sanitary District - Pump Station 14 Job 0423.00
Designed electrical and instrumentation and controls systems...read more » for the replacement of the District’s primary wastewater pump station. « read less
Designed a 13.8kV to 4.16kV double-ended substation to po...read more »wer five 2,000-hp pumps for the cooling water system at the Arc-Jet wind tunnel facility. Designed power distribution and motor control. « read less
Harrah's Rincon Casino - Water System Improvements Job 0428.00
Prepared predesign drawings and specifications of well pump,...read more » reservoir, and booster pumping station to supply potable water to resort. « read less
Northern California & Oregon Engineering Company serving Redding, the Bay Area, and the surrounding Northern California area, as well as Medford, Rogue Valley, Willamette Valley, Southern Oregon, Central Oregon, Nevada, Washington, Idaho, Utah, and Arizona.