Iron Mountain Mine - SCADA Telemetry Upgrade Job 0777.00
ArcSine Engineering was contracted to update and replace the...read more » existing SCADA software and PLCs for the wastewater treatment plant. This plant is part of the Environmental Protection Agency’s Superfund site’s effluent contamination mitigation process. The goal of this project was to reduce the risk of potential discharge of highly contaminated heavy metal leachate into the upper Sacramento River. The site’s SCADA system monitors and controls all aspects of the leachate treatment process, including regulating the release of treated water into the river. « read less
As part of design of new and upgraded facilities, designed n...read more »ew programmable controls. Projects include the following: • Martinez Pumping Station, Orinda Crossroads Pumping Station,Moraga Pumping Station, San Ramon Pumping Station, Lower Orinda Pumping Station « read less
City of Portland - Swan Island CSO Pump Station Job 0824.00
Designed electrical power distribution and controls for the ...read more »sewage pump station, including two 2,000-hp and two 800-hp, 4.16kV sewage pumps with provisions for three additional 2,250-hp pumps. The design included an outdoor substation including 5kV, double-ended switchgear, 480V double-ended switchgear, and 5kV variable-frequency drives. Included integration with City SCADA « read less
Contra Costa Water District - Revenue Metering/Data Acquisition Job 0877.00
Revenue metering data acquisition project. Planned, designed...read more », and implemented a state-of-the-industry remote data acquisition system for revenue metering. Project used Control Microsystems’ SCADAPack 350 PLC. « read less
Provided comprehensive control system programming services f...read more »or a major upgrade to the City’s primary water treatment facility. Included provisions for integration with future City-wide SCADA system software for the City’s water collection, treatment, and distribution system. Integration of data acquisition and controls for nine remote sites, including a raw water pump station, five reservoirs, and three pressure-relief valves. Work included: HMI programming; PLC programming; radio telemetry with multiple remote sites; for a total of 11 PLCs, 30 SCADA screens, and 9 remote sites. « read less
ArcSine produced a Needs Assessment Report for the City whic...read more »h included an executive summary, overall location map, system block diagrams, project criteria and constraints, narrative descriptions, evaluation of existing telemetry methods and recommendations for improvements, and planning level cost estimating for the water treatment and storage facility (which includes a booster pump station), as well as the wastewater treatment facility (which includes three pump stations). « read less
ArcSine produced a Needs Assessment Report for the City whic...read more »h included an executive summary, overall location map, system block diagrams, project criteria and constraints, narrative descriptions, evaluation of existing telemetry methods and recommendations for improvements, and planning level cost estimating for the water treatment and storage facility (which includes a booster pump station), as well as the wastewater treatment facility (which includes three pump stations). « read less