As part of design of new and upgraded facilities, designed n...read more »ew programmable controls. Projects include the following: • Martinez Pumping Station, Orinda Crossroads Pumping Station,Moraga Pumping Station, San Ramon Pumping Station, Lower Orinda Pumping Station « read less
EBMUD - Point Isabel Treatment Plant - Pumping Station Job 9823.00
Designed new programmable controls and modifications to, and...read more » interfaces with, the District’s distributed control system (DCS) as part of design of new and upgraded facilities. Projects include the following: Point Isabel Treatment Plant/Pump Station “N” consolidation, Pumping Station “Q”, Pumping Station “G”, and Operations Building upgrade. « read less
As part of design of new and upgraded facilities, designed n...read more »ew programmable controls. Projects include the following: • Martinez Pumping Station, Orinda Crossroads Pumping Station,Moraga Pumping Station, San Ramon Pumping Station, Lower Orinda Pumping Station « read less
City of Brentwood - Water and Wastewater Facilities Job 9913.00
Design of electrical and control systems for new 10-mgd, $39...read more »-million facility, with complete provisions to support later plant upgrades. Included dual-redundant programmable control systems and plant-wide fiber-optic networks in self-healing configuration. « read less
Data acquisition prototype project. Planned, designed, and t...read more »ested state-of-the-industry remote data acquisition system for revenue metering. Project used Schneider Automation’s Modicon M340 Programmable Automation Controller (PAC). « read less
Prepared a master plan for, and then designed, a 23-site SCA...read more »DA system. The project included in-depth planning for station primary and backup controls, supervisory monitoring and controls, communications, integration with the main wastewater treatment plant, system implementation, and evaluation of personnel required to support the system. « read less
Prepared a master plan for, and then designed, a 23-site SCA...read more »DA system. The project included in-depth planning for station primary and backup controls, supervisory monitoring and controls, communications, integration with the main wastewater treatment plant, system implementation, and evaluation of personnel required to support the system. « read less
As part of design of new and upgraded facilities, designed n...read more »ew programmable controls. Projects include the following: • Martinez Pumping Station, Orinda Crossroads Pumping Station,Moraga Pumping Station, San Ramon Pumping Station, Lower Orinda Pumping Station « read less
ArcSine Engineering was the lead consultant on evaluation an...read more »d design of replacement electrical systems for the 700-million-gallons-per-day influent pumping station at the Sacramento Regional Wastewater Treatment Plant. The project included a new 32 MVA substation and 4kV motor control centers, feeding 17,500 horsepower of load. Systems are fully redundant and serviceable. New equipment is housed in a 4,050-square-foot building, fully integrated with site plumbing, HVAC, communications, fire protection, and alarm systems. Building and landscape architecture complement surrounding facilities. The design also included use-change of the existing 1,400-square-foot switchgear room to provide office infrastructure. « read less
Design of electrical, instrumentation and controls, and SCAD...read more »A for a 370-hp sewage pumping station, with 400-kW standby generator. « read less
City of Brentwood - Heidorn Ranch Road Pump Station SDC Job 0207.00
Design of electrical and controls for 280-hp pumping station...read more », with 450kW standby generator; provisions for 500 hp total (future). Design included communications and SCADA system integration. « read less