Additional information for this project is available for download.
Select as many variables as you want below to fit the types of projects you want to see.
Showing page 1 of 29 (1~15 of 426) 123456789 ... 29
Project Name
City
State
Work Type(s)
Facility Type(s)
System Type(s)
Central Valley High School - Modernization Job 0006.00
Design for electrical, fire alarm, and lighting rehabilitati...read more »on for over 100,000 square feet of high school campus buildings. Fire alarm design provided for a new addressable system campus-wide. Electrical design included refurbishing power distribution equipment and providing a system of raceways campus-wide for future expansion of communications and computer networking systems. « read less
City of Brentwood - City-Wide SCADA System Job 0014.00
Design of a 28-site water SCADA system, complete. The projec...read more »t included identifying and documenting the ultimate system, then optimizing the initial project to meet budgetary constraints. Included system-wide instrumentation upgrades, and integration among City enterprises. « read less
Design of a 15,000-square-foot upscale office building. P...read more »roject criteria included use of sustainable materials and designs. Lighting system was designed around the use of natural lighting and programmable lighting control panels. These utilize inputs from an astronomical time clock, photocells, occupancy sensor, low-voltage switching, and control programs. Lighting controls were integrated with HVAC supervisory controls. « read less
Electrical and lighting design for the restoration of a 1,00...read more »0-seat, 1930’s era, art deco style movie house/theatre. ArcSine’s design for this challenging and rewarding project included extensive field investigation to understand the original electrical system and the changes that had been made over the years; electrical demolition work by our staff to ensure that selected raceways could be reused; careful, detailed planning of new electrical system components to minimize impact to the building’s original construction; period lighting design; and programming and startup of the building lighting control system. Included sound and theatrical lighting systems. « read less
Sacramento Regional County Sanitation District - SWGR 2E/2F Replacement Design Job 0126.02
ArcSine Engineering was the lead consultant on evaluation an...read more »d design of replacement electrical systems for the 700-million-gallons-per-day influent pumping station at the Sacramento Regional Wastewater Treatment Plant. The project included a new 32 MVA substation and 4kV motor control centers, feeding 17,500 horsepower of load. Systems are fully redundant and serviceable. New equipment is housed in a 4,050-square-foot building, fully integrated with site plumbing, HVAC, communications, fire protection, and alarm systems. Building and landscape architecture complement surrounding facilities. The design also included use-change of the existing 1,400-square-foot switchgear room to provide office infrastructure. « read less
Frank Hagel Federal Building - Chilled Water System Job 0205.00
ArcSine Engineering completed services for the Frank Hagel F...read more »ederal Building in Richmond, California, including cost estimating, electrical engineering, field work, mechanical engineering, and plumbing & piping services. « read less
Complete electrical and lighting design for a new outdoor am...read more »phitheater. Included a projection building, a screen building, area and path lighting, and a theatrical lighting system with programmed control system. « read less
Complete electrical and lighting design for a new floatin...read more »g complex, including gas docks, moorage, service centers, rental offices, and store. « read less
Power distribution, lighting, communications, HVAC, and plum...read more »bing for a new Seven Crown Resorts marina on Shasta Lake, California. Offshore facilities included: Central Building (14,000 square feet),Shop Building (800 square feet), Sewage Pump-Out Building, Fuel Barge, Dock Lights, Marina Moorage (235 slips), Houseboat Fleet Moorage (40 slips), Moorage Metering Pedestals (100), Lift Station, Potable Water Distribution, Gray Water Distribution, Wastewater Distribution, Building HVAC. Onshore facilities included: U.S. Forest Service coordination; PG&E coordination; SBC coordination; design of Primary Metering; design of 12kV distribution with sectionalizing equipment and transformers; design of roadway and parking lot lighting (500 Stalls); design of power distribution and lighting design for restroom building; power distribution and controls for the wells and lift stations; design of SBC distribution. « read less
Designed a 9,000-seat multi-use event center with two restau...read more »rants and bars and one cafe for the Fort Mojave Indian Tribe. The design included a 12.47-kV distribution system and a 2.5-MVA substation with redundant primary supply, as well as design of infrastructure for events including concerts, sporting events, rodeos, trade shows, motocross, and monster trucks. « read less
Northern California & Oregon Engineering Company serving Redding, the Bay Area, and the surrounding Northern California area, as well as Medford, Rogue Valley, Willamette Valley, Southern Oregon, Central Oregon, Nevada, Washington, Idaho, Utah, and Arizona.